orthopedic pain management

Ground Breaking Ceremony of Karachi-Hyderabad Motorway M9 on 11th March 2015


Ground Breaking Ceremony of Karachi-Hyderabad Motorway M9 on 11th March 2015

Prime Minister Mian Muhammad Nawaz Sharif will inaugurate the work on Karachi-Hyderabad section of Lahore-Karachi Motorway. This will be Six Lane highway road which will start from Karachi and will terminate at Sindh’s second largest city, the Hyderabad. The said groundbreaking ceremony will be held on Wednesday, March 11, 2015 in Karachi

This motorway will be the part of National and Regional Economic Corridor. Statistics of Karachi-Hyderabad Motorway M9 are as follows:

  • Length of Motorway: 136 Kilometers
  • No. of Interchanges: 8
  • No. of Service Areas: 2
  • Construction By: Frontier Works Organization (FWO)

Super Highway or Malir Motorway is a 136-km long 4-lane highway connecting the cities of Hyderabad and Karachi in the Sindh province of Pakistan. It is a part of Pakistan’s National Highways Network.

Signing of MOU between FWO and NHA

The Karachi-Hyderabad Motorway (M9) has been entrusted to Frontier Works Organisation for the next 25 years on Built-Operate-Transfer basis. A signing ceremony in this regard was held on 10 Mar 2015 at Headquarter FWO that was attended by the Chairman NHA Shahid Ashraf Tarar, Engineer in Chief Lt Gen Khalid Asghar, and Director General FWO Major General Muhammad Afzal.

According to the contract agreement the existing 4 Lane Karachi-Hyderabad Superhighway will be converted in 6 Lane Motorway meeting International Standards and Maintain and Operate the Motorway, in line with International Practices over next twenty five years.

01 Ground Breaking Ceremony of Karachi-Hyderabad Motorway M9 on 11th March 2015 02 Ground Breaking Ceremony of Karachi-Hyderabad Motorway M9 on 11th March 2015 03 Ground Breaking Ceremony of Karachi-Hyderabad Motorway M9 on 11th March 2015

Comments (5)

Trackback URL | Comments RSS Feed

  1. Nayab Siddiqui says:

    What is construction period?

  2. S.Mumtaz Hyder Rizvi says:

    Thanks GOD .
    PAKISTAN Zindabad

  3. Iftikhar says:

    Very good step for DHA city. Lets hope that work on Malir Motorway also starts soon. Things definitely seem to be moving in the right direction

  4. Asif says:

    Its 33 months

  5. noman sheikh says:

    kb kt complet hoga hiway

Leave a Reply