Routine Work by Cantonment Board Clifton on 2nd September, 2020


Laying of pipes across Khayaban e Ittehad Road to Drain out Storm Water at Bara Bukhari, Ph – 6

Dewatering work at different Locations in DHA
Khayaban e Shujaat cross Muhafiz
23rd, 27th, 28th Streets of Muhafiz
Khayaban e Behria

Footpath Repairing work at Khayaban e Bahria

Laying of sewerage line Phase 2 Extension for removal of blockage

Drain top concreting at 11th commercial Street Phase IV

Installed 2nd pump at 21st street khayaban e Seher Phase VI

Dewatering work at bara Bukhari Commercial.

Dewatering work, Small pumps installed on Khayaban e Shujat for remaining water.

Desilting of sewerage line at Saba Avenue.

Dewatering through tankers at Bara Bokhari

Street Lights Functional in different areas of CBC.